---
title: "How to Read a P&ID - Pressure Control — asset register"
doc_type: pid-asset-register
source: "images.png"
tags: [NITROGEN, HOT WATER, V-1, TT-102, TIC-102, V-100, HEAT PAD, PY-101A, PIC-101, PY-101B (relay), PSV-?, PY-101B, TO VENT, LG-2, LT-100, LI-100, V-2, TO USERS]
summary: "This P&ID illustrates a pressure control system for a hot water storage vessel (V-100) heated by a heat pad. Nitrogen is used to blanket/pressurize the vessel via a control loop containing PIC-101 and associated solenoid valves, with an automated vent line to manage overpressure. Additionally, temperature and level monitoring loops are included."
---

# How to Read a P&ID - Pressure Control

This P&ID illustrates a pressure control system for a hot water storage vessel (V-100) heated by a heat pad. Nitrogen is used to blanket/pressurize the vessel via a control loop containing PIC-101 and associated solenoid valves, with an automated vent line to manage overpressure. Additionally, temperature and level monitoring loops are included.

**Source:** images.png · **Components:** 18 (2 equipment, 9 instrument, 3 valve, 4 other)

## Equipment (2)

| Tag | Description | Details | Connects to |
|---|---|---|---|
| V-100 | Hot Water Storage Tank | Includes HEAT PAD | V-1, TT-102, PY-101A, PY-101B (relay), PY-101B (valve), LG-2, LT-100, V-2 |
| HEAT PAD | Heat Pad | Attached to V-100 | TIC-102, V-100 |

## Instruments (9)

| Tag | Function (ISA 5.1) | Description | Details | Connects to |
|---|---|---|---|---|
| TT-102 | TT = Temperature Transmitter | Temperature Transmitter | Field mounted | V-100, TIC-102 |
| TIC-102 | TIC = Temperature Indicator Controller | Temperature Indicator Controller | Field mounted | TT-102, HEAT PAD |
| PY-101A | PY = Pressure Relay/Compute | Pressure Relay/Compute | Controls nitrogen inlet valve. Field mounted. | PIC-101, NITROGEN, V-100 |
| PIC-101 | PIC = Pressure Indicator Controller | Pressure Indicator Controller | Field mounted. | PY-101A, PY-101B, PY-101B (relay) |
| PY-101B (relay) | PY = Pressure Relay/Compute | Pressure Relay/Compute | Field mounted | PIC-101, V-100 |
| PY-101B | PY = Pressure Relay/Compute | Pressure Relay/Compute | Controls vent valve. Field mounted. | PIC-101, V-100, TO VENT |
| LG-2 | LG = Level Gauge | Level Gauge | Field mounted | V-100 |
| LT-100 | LT = Level Transmitter | Level Transmitter | Field mounted | V-100, LI-100 |
| LI-100 | LI = Level Indicator | Level Indicator | Field mounted | LT-100 |

## Valves (3)

| Tag | Description | Details | Connects to |
|---|---|---|---|
| V-1 | Manual Valve | Normally Closed (N.C.) | HOT WATER, V-100 |
| PSV-? | Pressure Safety Valve | Relief to atmosphere | V-100 |
| V-2 | Manual Valve | Normally Closed (N.C.) | V-100, TO USERS |

## Other (4)

| Tag | Description | Details | Connects to |
|---|---|---|---|
| NITROGEN | Process fluid off-page connector | Source of Nitrogen | PY-101A |
| HOT WATER | Process fluid off-page connector | Source of Hot Water | V-1 |
| TO VENT | Process fluid off-page connector | Destination for vent | PY-101B |
| TO USERS | Process fluid off-page connector | Destination to users | V-2 |

## Notes on drawing

- P&ID Drawings 101 - Corso Systems Training
- Corso System Training 17
